The green dumpster will arrive on May 26, and will be in the park through June 5.
Archives for May 2017
Spring Facility Updates
New bookshelves were added to the Library. A cabinet will be installed that will house the electronic microphone equipment that is currently in the clubhouse. The cabinet will be located in the library. A new maintenance shed has been installed behind the dumpster area. This shed replaced an old shed that was previously located there. A security […]
Fence Upgrade
A perimeter fence along Birch Bay Lynden Road will be replaced. The first phase of the replacement is for 200 feet of a 7-foot high black powder-coated security fence. This first phase is now completed. The projected completion date for the remainder of the fence along Birch Bay-Lynden Road will be sometime in 2018.
Pool is Now Open!
The pool is now open for use. It opened last Sunday, Mother’s Day. Generally, the pool closes for the season during the last week in September. The actual date is flexible depending upon the days of the week as well as the weather. Announcements will be posted as the actual dates are determined. Be sure to check out […]